Between 2015 and 2020, BESIX Watpac delivered a series of terminal upgrades at Brisbane Airport, enhancing passenger facilities and baggage handling systems while maintaining uninterrupted airport operations.

Project overview

BESIX Watpac carried out several modernisation projects within Brisbane Airport’s domestic terminal between 2015 and 2020. The programme included upgrades to passenger and retail areas, as well as the modernisation of the baggage handling system between 2016 and 2017. Delivered in a busy airport environment with continuous operations and high passenger volumes, the works required careful planning to ensure minimal impact on airport activities and the passenger experience.

Scope of works

The programme combined visible improvements to passenger-facing spaces with upgrades to critical operational systems. Works included the fit-out of 48 retail units and the refurbishment of the food court, alongside the modernisation of the airport’s baggage handling system. Delivered across both landside and airside areas, the works were carefully phased to maintain passenger flows, airport operations and commercial activities. Progressive integration of new baggage equipment, combined with close coordination with the airport operator, ensured continuity of service throughout the project.

Key highlights

  • Modernisation programme delivered between 2015 and 2020

  • Fit-out of 48 retail units

  • Refurbishment of the terminal food court

  • Modernisation of the baggage handling system

  • Multi-award Winner 2021 Excellence in Workplace Health and Safety Master Builders Queensland (Brisbane)

“As with any project, safety was our highest priority, an imperative made even more critical within a live operational environment. The team’s unwavering commitment to the safety of workers, passengers and airport personnel resulted in zero lost-time injuries over a three-and-a-half-year period.” Al Crosby, Manager BESIX Watpac for South Australia

Project details

Project nameBrisbane Airport Domestic Terminal Modernisation
LocationAdelaide, Australia
Building period2015 - 2020
SectorBuildings
Area of expertiseAirports
Stakeholder(s)BESIX Watpac
Contract typeDesign & Build
ClientBrisbane Airport